- All
- Antelope Valley
- Burbank
- Corcoran
- El Cajon
- Escondido
- Fullerton
- Geyserville
- Gilroy
- Grossmont
- Huntington Beach
- Huntington Park
- Imperial Beach
- Inglewood
- Irvine
- Kelseyville
- Laguna Niguel
- Long Beach
- Los Angeles
- Manhattan Beach
- Modesto
- Napa
- Orange
- Paramount
- Redlands
- Riverside
- Sacramento
- Salinas
- San Diego
- San Francisco
- San Jose
- San Marcos
- Santa Ana
- Santa Clarita
- Soledad
- Thermolito
- Upper Lake
- Wasco
- Whittier
61 Results
Pennekamp Elementary School
Education
Manhattan Beach, California
Pennekamp Elementary School
Manhattan Beach, California
Pennekamp Elementary School
Manhattan Beach, California
The Pennekamp Elementary School project consists of a two story structure which houses an elementary school campus expansion. The project features flexible classrooms, staff lounge, student and staff restroom facilities, and support spaces. The stairways and elevator are accessed from these breezeways which conceals these elements within the building footprint. Large overhangs are provided along the front and rear of the building to create outdoor learning environments. The large exterior balconies are directly accessed from each classroom with traditional doors and glazed operable walls. Parapets of various heights are used to visual interest while screening the roof top mechanical equipment.
Project Details
Project Size: 20,543 sq/ft
Number of Modules: 35
Architect: DLR Group
Product Type: Two-Story
Hope on Broadway
Residential
Los Angeles, California
Hope on Broadway
Los Angeles, California
Hope on Broadway
Los Angeles, California
The Hope on Broadway project consists of a four-story structure which houses a multi-family supportive apartment facility with 49 rental units. A three-story modular building sits above the site-built ground level podium. The modular portion of the project features 47 studio units, trash rooms, utility rooms, interior corridors, interior stairways, and a roof top patio. All units are well appointed with a kitchen, living area and full bathroom. The building exterior features metal siding panels and large glazed openings for each dwelling. A spacious roof top patio provides a gathering place for residents to mingle and relax.
Project Details
Project Size: 19,890 sq/ft
Number of Modules: 69
Grandview Elementary School
Education
Manhattan Beach, California
Grandview Elementary School
Manhattan Beach, California
Grandview Elementary School
Manhattan Beach, California
The Grandview Elementary School project consists of a two story structure which houses an elementary school campus expansion. The project features 10 flexible classrooms, staff lounge, student and staff restroom facilities, and support spaces. Due to the building location on the campus a pair of breezeways were incorporated into the design to provide access through the building to the upper campus and the lower campus. The stairways and elevator are accessed from these breezeways which conceals these elements within the building footprint. Large overhangs are provided along the front and rear of the building to create outdoor learning environments. The large exterior balconies are directly accessed from each classroom with traditional doors and glazed operable walls. Parapets of various heights are used to visual interest while screening the roof top mechanical equipment.
Project Details
Project Size: 16,128 sq/ft
Number of Modules: 28
Product Type: Two-Story
Jordan Elementary School
Education
Whittier, California
Jordan Elementary School
Whittier, California
Jordan Elementary School
Whittier, California
The Jordan Elementary School project consists of a fully modular administrative building to replace an existing site-built administrative building. The new administrative building includes a lobby, conference room, private office, nurses’ offices, staff workroom, staff lounge, restrooms and utility room. To match the adjacent existing structures this building features a steep pitch roof, stucco exterior wall finish, and large glazed openings. Large overhangs at the front and rear of building are combined with a site erected canopy to provide shade and weather protection at all entrances.
Project Details
Project Size: 2,400 sq/ft
Number of Modules: 5
Product Type: One-Story
Alisal Community School
Education
Salinas, California
Alisal Community School
Salinas, California
Alisal Community School
Salinas, California
The Alisal Community School project consists of a two-story structure which houses an elementary school campus expansion. This building features 21 classrooms, 2 special education classrooms, 2 collaboration spaces, library, counseling offices, student and staff restroom facilities, and support spaces. Due to the building location on the campus a large breezeway was incorporated into the design to provide access through the building to the east campus and west campus. A portion of the upper-level cantilevers beyond the lower level to create an outdoor learning environment. Interior corridors are providing for a portion of the lower-level and the entire upper-level. The completed project reflects the coordinated efforts of all team members to provide a design focused experience.
Project Details
Project Size: 38,116 sq/ft
Number of Modules: 64
Architect: Aedis Architects
Product Type: Two-Story
Frank J. Zamboni Middle School
Education
Paramount, California
Frank J. Zamboni Middle School
Paramount, California
Frank J. Zamboni Middle School
Paramount, California
The Frank J. Zamboni Middle School project is made possible to the design assist project approach utilized on this project the design architect and the modular building design team were able to collaborate on design considerations during the conceptual phase of the project to ensure the modular construction systems selected would support the design intent. The project consists of a single structure which houses a large classroom building expansion, a new administrative building, a new library and the related functional spaces. The student portion of the building contains 15 instructional classrooms, a vocational classroom, a dance studio, a library, restrooms, interior corridors, interior stairs, and an interior elevator. The administrative portion of the building contains a lobby, 7 private offices, an open work area, a teacher workroom, a staff lounge, and restrooms. The building exterior is covered with stucco and feature metal panel accents which are combined with large aluminum glazing systems to provide a striking architectural presence. The building interior features abundant natural light in every educational space and high ceilings throughout. The completed project reflects the coordinated efforts of all team members to provide a design focused experience.
Project Details
Project Size: 31,872 sq/ft
Number of Modules: 60
Architect: WLC Architects, Inc.
Product Type: Two-Story
Fairview Elementary School Cafeteria
Education
Modesto, California
Fairview Elementary School Cafeteria
Modesto, California
Fairview Elementary School Cafeteria
Modesto, California
The project consists of a permanent modular structure which houses the Fairview Elementary School Cafeteria/Multi-Purpose Room. The building houses staff rooms, bathrooms, a fully equipped kitchen, produce preparation area, walk-in freezer, food storage room and support spaces. The building exterior utilizes stucco with stone accents. The project requirements required a custom designed modular solution which was capable of incorporating the unique structural, utility and spatial demands of a production kitchen facility. The interior finishes were selected to provide durable and sanitary surfaces which support the intended function of each space while provided a comfortable and safe working environment. The roof structure utilized a project specific design which needed to be capable of supporting the roof top equipment and suspended exhaust hoods while also providing large pathways for the exhaust air, make-up air and conditioned air systems. A light weight concrete floor system was poured the in the factory for all modules.
Project Details
Project Size: 8,640 sq/ft
Number of Modules: 12
Architect: California Design West Architects
Product Type: One-Story, Multi-Purpose Buildings
Upper Lake Elementary
Education
Upper Lake, California
Upper Lake Elementary
Upper Lake, California
Upper Lake Elementary
Upper Lake, California
The project consists of a kindergarten classroom building, administrative building and library building. The classroom building contains 4 instructional classrooms, 2 workrooms, collaboration central core area, student restrooms, and support spaces. The administrative building contains a lobby, 4 private offices, central work area, nurses office, and restrooms. The building exterior features a stucco exterior finish with accent colors, deep overhangs, and storefront window and door systems. Sloped suspended ceiling systems are used through the classrooms and library to maximize the interior volume. All occupied spaces features abundant glazing or tubular skylights to provide natural lighting. All classrooms have direct access to the central core which is used for small group learning and collaboration.
Project Details
Project Size: 9,223 sq/ft
Number of Modules: 19
Architect: WLC Architects, Inc.
Product Type: Transitional Kindergarten (TK), One-Story
Sierra Preparatory Academy
Education
Santa Ana, California
Sierra Preparatory Academy
Santa Ana, California
Sierra Preparatory Academy
Santa Ana, California
Utilizing a design assist project approach allowed the design architect and the modular building design team to collaborate on design considerations during the early in the design process to ensure the modular construction systems selected would support the design intent. The project consists of two structures which each house two Pre-Kindergarten classrooms. A separate modular restroom building was provided to serve the adjacent playground. Each classroom contains student restroom facilities, ample classroom equipment storage and an additional storage room for outdoor learning and play equipment. The buildings’ exterior is covered with a mixture of fiber cement siding panels and multi-color vertical metal siding panels to create a striking architectural presence. The building interior features large windows, and clerestory windows, to provide abundant natural light in every educational space. The classrooms utilize a curved roof and ceiling which provide ceilings as high at 14’-0”. The completed project reflects the coordinated efforts of all team members to provide a design focused experience.
Project Details
Project Size: 6,384 sq/ft
Number of Modules: 17
Architect: Morrissey
Product Type: Transitional Kindergarten (TK), One-Story
Camille Creek Community School
Education
Napa, California
Camille Creek Community School
Napa, California
Camille Creek Community School
Napa, California
The Camille Creek Community School project consists of a two story structure which houses a special purpose high school campus. The project features 6 flexible classrooms, 2 standard classrooms, a commercial kitchen, 11 counseling offices, administrative space, 2 conference rooms student and staff restroom facilities, and support spaces. The building exterior utilizes a mixture of stucco, fiber cement panels and lap siding. Accent colors are used throughout the project to create a vibrant and welcoming exterior. The building shape and exterior balcony create a large patio for outdoor dining and education space. Parapets of various heights are used to visual interest while screening the roof top mechanical equipment. The 12’x40’ modules are 13’-6” tall to accommodate 9’-6” ceilings while concealing all utility systems. A light weight concrete floor system was poured the in the factory for all modules. All classrooms, and most occupied spaces, feature large windows to provide natural daylighting. High efficiency LED lights with occupancy sensing controls and automatic daylighting controls were used in all classrooms.
Project Details
Project Size: 26,691 sq/ft
Number of Modules: 40
Product Type: Two-Story
McFadden Intermediate School
Education
Santa Ana, California
McFadden Intermediate School
Santa Ana, California
McFadden Intermediate School
Santa Ana, California
Utilizing a design assist project approach allowed the design architect and the modular building design team to collaborate on design considerations during the early in the design process to ensure the modular construction systems selected would support the design intent. The project consists of a single structure which houses four Pre-Kindergarten classrooms. Each classroom contains student restroom facilities, ample classroom equipment storage and an additional storage room for outdoor learning and play equipment. The buildings’ exterior is covered with a mixture of fiber cement siding panels and multi-color vertical metal siding panels to create a striking architectural presence. The building interior features large windows, and clerestory windows, to provide abundant natural light in every educational space. The classrooms utilize a curved roof and ceiling which provide ceilings as high at 14’-0”. The completed project reflects the coordinated efforts of all team members to provide a design focused experience.
Project Details
Project Size: 5,904 sq/ft
Number of Modules: 16
Architect: Morrissey
Product Type: Transitional Kindergarten (TK), One-Story
VIP Village Preschool
Education
Imperial Beach, California
VIP Village Preschool
Imperial Beach, California
VIP Village Preschool
Imperial Beach, California
The VIP Village Preschool project consists of a fully modular preschool campus including 7 buildings ranging in size from 2,560 SF to 6,480 SF. There are 5 classroom buildings which feature 21 classrooms with dedicated toilet facilities and 2 staff workrooms. The administrative building contains 6 private offices, a conference room, a lobby, a nurse’s office, staff restroom facilities and various support spaces. The multipurpose building houses a large multiuse assembly and lunch room, a kitchen, a staff lounge and restroom facilities. The building exteriors utilize a stucco finish system with a series of aluminum reveals and a flourish of colorful accents. Large overhangs with a standing seam roof system provide shade and weather protection at classroom entrances while the canopies provided at the multipurpose building creates visual interest while providing protection for the building entries. The classroom interiors feature vibrant accent colors and provide a comfortable learning environment.
Project Details
Project Size: 30,160 sq/ft
Number of Modules: 61
Product Type: Transitional Kindergarten (TK), One-Story, Complete Campus
Johnson Elementary School
Education
El Cajon, California
Johnson Elementary School
El Cajon, California
Johnson Elementary School
El Cajon, California
The Johnson Elementary School project consists of a two story structure which houses the elementary school classrooms, breakout rooms and related functional spaces. The project features 9 classrooms, 3 special education breakout rooms, student and staff restroom facilities, and support spaces. A bridge is provided for connection to a future 2nd phase while covered exterior stairways and a modular elevator tower provide vertical circulation systems. The building exterior utilizes a stucco finish vibrant accent colors at projections, ceramic tile wainscot provides additional architectural flourishes. Large overhangs with a standing seam roof system provide shade and weather protection at classroom entrances while parapets are used to screen the roof top mechanical equipment. The building stands out as a bright and inviting addition to the campus.
Project Details
Project Size: 12,640 sq/ft
Number of Modules: 34
Product Type: Two-Story
John Muir Fundamental Elementary
Education
Santa Ana, California
John Muir Fundamental Elementary
Santa Ana, California
John Muir Fundamental Elementary
Santa Ana, California
John Muir Fundamental Elementary consists of a single structure which houses a large classroom building expansion and the related functional spaces. The building contains 26 classrooms, a multipurpose/lobby space, staff work room, restrooms, interior corridors and interior stairs. The buildings’ exterior is covered with a mixture of fiber cement siding panels and stucco which are combined with multi-color glazing panels and a large curtain wall system to provide a striking architectural presence. The building interior features abundant natural light in every educational space and high ceilings throughout. The completed project reflects the coordinated efforts of all team members to provide a design focused experience.
Project Details
Project Size: 33,792 sq/ft
Number of Modules: 64
Product Type: Two-Story
County of San Benito – Behavioral Health Center
Commercial
California
County of San Benito – Behavioral Health Center
California
County of San Benito – Behavioral Health Center
California
The project consists of a single-story structure which houses a behavioral health medical campus. The project features 34 clinical treatment room, group therapy rooms, triage rooms, administrative office, a lobby and waiting area, conference/assembly rooms, restroom facilities, utility rooms, and an indoor garden. The building exterior utilizes a mixture of various fiber cement panel types include vertical grooved siding and lap siding. The exterior form utilizes a combination of low sloped standing seam roofs and parapets. The building interior utilizes vinyl plank flooring, natural stone, ceramic tile and carpet tiles throughout with level 5 finished drywall. Accents are used on the floor surface and walls to create a calm and inviting environment. A courtyard is located in the center of building which features an open-air outdoor garden.
Project Details
Project Size: 17,257 sq/ft
Number of Modules: 44
California State University San Marcos – Veterans Center
Education
San Marcos, California
California State University San Marcos – Veterans Center
San Marcos, California
California State University San Marcos – Veterans Center
San Marcos, California
California State University San Marcos campus houses the Veterans Support Center. The building houses a lobby, meeting space, four private offices, and support spaces. The building exterior utilizes a mixture of smooth fiber cement siding, metal panels, and horizonal wood siding and accents. A stepped roof design creates a visual connection with the adjacent structure while screening the mechanical equipment and providing the supporting structure for a future solar panel system. Large glazed openings are used to provide natural lighting and to take advantage of the views onto college campus. The unique project site required an installation which extended the building approximately 40’ over the hillside. An exterior glazed operable wall system allows the building to open onto the raised deck patio for large events.
Project Details
Project Size: 1,158 sq/ft
Number of Modules: 2
Aspire Antonio Maria Lugo Academy
Education
Huntington Park, California
Aspire Antonio Maria Lugo Academy
Huntington Park, California
Aspire Antonio Maria Lugo Academy
Huntington Park, California
Aspire Antonio Maria Lugo Academy is a TK – 5 charter school campus located in Los Angeles. It is a single structure, two-story building which encompasses 17 classrooms, a library, a kitchen, multipurpose space, office spaces, interior corridors and interior stairs. The buildings’ exterior is covered with a vertical metal siding system that utilizes multiple colors and panel profiles, with aluminum and stucco accents, to provide a striking architectural presence. The building interior features abundant natural light in every educational space and 10’ high ceilings throughout. The finished building reflects the coordinated efforts of all team members to provide a design focused experience.
Project Details
Project Size: 37,248 sq/ft
Number of Modules: 64
Product Type: Two-Story, Complete Campus
Olive View – UCLA Medical Center Restorative Care Village
Commercial
Los Angeles, California
Olive View – UCLA Medical Center Restorative Care Village
Los Angeles, California
Olive View – UCLA Medical Center Restorative Care Village
Los Angeles, California
The Olive View project consists of six two story structures which in combination form a restorative care medical campus. The project includes five identical Residential Treatment Program (RTP) buildings and one Recuperative Care Center (RCC) building. Each RTP building contains 7 double occupancy sleeping rooms, 2 single occupancy sleeping rooms, clinical offices, administrative offices, group therapy rooms, assembly spaces, restrooms, laundry rooms, and support spaces. The RCC building 12 quad occupancy sleeping rooms, clinical offices, administrative offices, group therapy rooms, assembly spaces, kitchen, dining rooms, lobby, restrooms, laundry rooms, and support spaces. The exterior features a stucco wall finish with parapets. The interior finishes consist of vinyl plank, carpet tiles, ceramic tiles and painted drywall. The interior and exterior utilize accent color and materials to support wayfinding and to develop a calm environment.
Project Details
Project Size: 65,496 sq/ft
Number of Modules: 132
O’Farrell Charter School
Education
San Diego, California
O’Farrell Charter School
San Diego, California
O’Farrell Charter School
San Diego, California
O'Farrell Charter School project consists of eight separate structures which house an entire charter high school campus and the related functional spaces. The buildings contain 14 instructional classrooms, 5 flexible learning labs, 2 science laboratory classrooms, administrative spaces, and restroom spaces. The building exterior is covered with various sizes of horizontal lapped fiber cement siding panel, with aluminum panel accents, to create a contemporary architectural presence. The building interior features abundant natural light in every educational space due to the extensive use of large glazing systems. The finished campus reflects the successful efforts of all team members to provide a design focused experience.
Project Details
Project Size: 27,840 sq/ft
Number of Modules: 58
Product Type: One-Story, Complete Campus
James Forrest Elementary School
Education
Wasco, California
James Forrest Elementary School
Wasco, California
James Forrest Elementary School
Wasco, California
The James Forrest Elementary School project consists of five permanent modular classroom buildings ranging in size from 5,700 SF to 11,200 SF. The project features 8 kindergarten classrooms with dedicated toilet facilities, 2 special education classrooms with dedicated toilet facilities, 24 standard classrooms, student and staff restroom facilities and various support spaces. The building exterior utilizes a stucco finish of various colors and ceramic tile accents. Large overhangs with a standing seam roof system provide shade and weather protection at classroom entrances while facades are provided at the building ends to create visual interest and provide protection for the restroom entries. The classroom interiors feature vibrant accent colors and provide a comfortable learning environment.
Project Details
Project Size: 41,040 sq/ft
Number of Modules: 100
Architect: Ordiz-Melby Architects
Product Type: One-Story, Complete Campus
Charles R. Drew University
Commercial
Los Angeles, California
Charles R. Drew University
Los Angeles, California
Charles R. Drew University
Los Angeles, California
Charles R. Drew was designed with the design – bid – build concept. Silver Creek and the design team effectively coordinated all the components of the needed design elements. Modular elevator, interior and exterior stairs, dental equipment and other OSHPD 3 requirements was the design challenges. Charles R. Drew University, NOLP and APLA are the three-end used of this building space. CDU is providing health services for its students. Both NOLP and APLA provide community outreach, providing a food bank for the homeless community and health / dental services for a underserved LGBTQ+ community. The building was broken up into its three main components using a combination of 55 rooms, restrooms, food pantry, dental care, dental labs, lobbies, phlebotomy, medical exam rooms and office spaces amongst others. The exterior is covered with stucco, metal panels and a brick veneer façade. Each of the exterior finish types and colors tie together and create a magnificent architectural creation. One of the best focal points lays at the front of the building, the tall aluminum curtain system shows the design focused interior stairway. The curtain system at the stairway provides an abundance of natural light into the first and second floor lobby spaces. Every office, exam room and dental procedure room has ample amount of light using the perimeter ribbon glazing at both floor levels. With the interior atmosphere and exterior brilliance, the building itself ties together with the social conscience community needs.
Project Details
Project Size: 9,972 sq/ft
Number of Modules: 16
KIPP: Academy of Opportunity
Education
Los Angeles, California
KIPP: Academy of Opportunity
Los Angeles, California
KIPP: Academy of Opportunity
Los Angeles, California
The KIPP Academy of Opportunity project consists of a three story structure which houses an entire charter school campus and the related functional spaces. The building contains 18 classrooms, a kitchen, multipurpose space, administrative spaces, interior corridors, an interior elevator, and interior stairs. The building exterior features plaster with a bright color palette and aluminum glazing systems. The finished building reflects the coordinated efforts of all team members to provide a design focused experience.
Project Details
Project Size: 27,429 sq/ft
Number of Modules: 40
Product Type: Two-Story, Complete Campus
Under Construction – Hope on Avalon
Residential
Los Angeles, California
Under Construction – Hope on Avalon
Los Angeles, California
Under Construction – Hope on Avalon
Los Angeles, California
The Hope on Avalon project consists of two different buildings: residential and transitional assisted living. The supportive residential will have five stories; four stories are modular with 60 one-bedroom and 7 studios. The transitional assisted living has two stories of modules with four residents per room. The project features a conference room, community room, and laundry room.
Project Details
Product Type: Two-Story
Under Construction – Hope on Hyde
Residential
Los Angeles, California
Under Construction – Hope on Hyde
Los Angeles, California
Under Construction – Hope on Hyde
Los Angeles, California
The Hope on Hyde project consists of a five-story structure which houses a multi-family apartment facility with 98 rental units. A four-story modular building sits above the site-built ground level podium. The project features 24 one-bedroom units, 74 studio units, community room, laundry room, trash rooms, utility rooms and roof top patio. Bike storage and maintenance room included.
Project Details
Number of Modules: 184
Under Construction – Santa Monica
Residential
Los Angeles, California
Under Construction – Santa Monica
Los Angeles, California
Under Construction – Santa Monica
Los Angeles, California
The Santa Monica project consists of two different buildings: residential and transitional assisted living. The supportive residential will have five stories; four stories are modular with 60 one-bedroom and 7 studios. The transitional assisted living has two stories of modules with four residents per room. The project features a conference room, community room, and laundry room.
Project Details
Under Construction – Hopkins
Residential
Under Construction – Hopkins
Crean Lutheran High School
Education
Irvine, California
Crean Lutheran High School
Irvine, California
Crean Lutheran High School
Irvine, California
Crean Lutheran High School houses 22 classrooms, a laboratory prep room, two workrooms, administrative offices, a conference room, student and staff restrooms, and integrated building service operations rooms. Additionally a series of aluminum curtain wall assemblies were combined with stone tile flooring, custom woodwork, and 28’-0” tall ceilings to produce a truly striking lobby. Each classroom has two large storefront style windows and is decorated with of a two-tone color scheme which combines painted and tackable walls. A central corridor is located along the interior of the building which provides access to all spaces within the structure. The building’s exterior consisted of two-tone stucco with stone veneer. The exterior walls were built in multiple planes to allow for deep recesses and large moldings which act together to create a remarkable architectural impression.
Project Details
Project Size: 34,000 sq/ft
Product Type: Two-Story
Long Beach Gas & Oil Department
Commercial
Long Beach, California
Long Beach Gas & Oil Department
Long Beach, California
Long Beach Gas & Oil Department
Long Beach, California
The Long Beach Gas & Oil Department service the supply of natural gas to approximately 500,000 residents and businesses in Long Beach, California. The organization needed new office space as they realigned and consolidated their City operations. Long Beach G as & Oil selected Fernald-West for the design of a new modular structure to be built to achieve LEED Gold. Commercial Mobile Systems in collaboration with Silver Creek Industries subsequently constructed, delivered and installed a 16,000 square foot high performance administrative building. The two story building features exposed open ceilings, clerestory and storefront windows to maximize daylighting, steel clear span trusses providing exceptional strength and earthquake resistance, a storefront curtain wall, and a terrace balcony for building occupants.
Project Details
Project Size: 16,000 sq/ft
Architect: Fernald West Architects
Mission Middle School
Education
Escondido, California
Mission Middle School
Escondido, California
Mission Middle School
Escondido, California
The Mission Middle School project consists of a two story structure which houses the STEM program classrooms for the campus and related functional spaces. The building contains instructional classrooms, flexible learning and display areas, administrative spaces, interior stairways, an interior elevator, and restroom spaces. The building exterior is a mixture of plaster and various sizes of horizontal lapped fiber cement siding panels. Varying parapet heights, and projections at portions of the 2nd level were used to create separate exterior masses. The building interior features abundant natural light in every educational space due to the extensive use of large glazing systems. Overhead doors were provided at each classroom to facilitate collaboration between the classes and students.
Project Details
Project Size: 18,046 sq/ft
Number of Modules: 36
Product Type: Two-Story
West Creek Academy
Education
Santa Clarita, California
West Creek Academy
Santa Clarita, California
West Creek Academy
Santa Clarita, California
The West Creek Academy project consists of a two-story structure which houses specialty program classrooms (flex labs, music rooms) for the campus and related functional spaces. The building includes 8 classrooms, 4 breakout rooms, 3 exterior stairways, a bridge, an elevator, and restroom spaces. The building exterior consists of plaster with stone accents to match the existing campus. All of the finish materials and the building form were selected and designed to create a cohesive addition to the campus. A site installed roof framing system was used to match the steep slope of the adjacent buildings which resulted in a total building height of 33’-6”. The completed building represents a design focused experience which is seamlessly integrated into existing campus.
Project Details
Project Size: 19,439 sq/ft
Number of Modules: 37
Product Type: Two-Story
Fremont Mission San Jose
Education
San Jose, California
Fremont Mission San Jose
San Jose, California
Fremont Mission San Jose
San Jose, California
Fremont Mission San Jose project consists of a single two-story modular building containing approximately 13,000 SF. The building houses 10 classrooms, a workroom, administrative offices, student and staff restrooms, and integrated building service operations room. Additionally, an open ended central corridor is located along the interior of the building which provides access to all spaces within the structure. The building’s exterior consists of two-tone stucco with clear and bonze storefront window systems. The exterior walls were built in multiple planes and heights to allow for exterior finish variations which are combined with the shade devices and stonework accents to create a remarkable architectural impression. The final building truly represents a design focused experience.
Project Details
Project Size: 13,000+ sq/ft
Number of Modules: 24
Product Type: Two-Story
Aliso and Wood Canyons Wilderness Park Visitor Center
Commercial
Laguna Niguel, California
Aliso and Wood Canyons Wilderness Park Visitor Center
Laguna Niguel, California
Aliso and Wood Canyons Wilderness Park Visitor Center
Laguna Niguel, California
The Aliso and Wood Canyons Wilderness Park Visitor Center project consists of two modular structures which house the Aliso and Wood Canyons Wilderness Park Visitor Center. The primary structure houses the lobby, exhibit space, ranger station, meeting room and support spaces. The secondary structure houses 4 public restrooms, a public shower room, and a custodial room. The building exterior utilizes a mixture of vertical grooved fiber cement siding and horizonal lapped fiber cement siding. The unique stepped roof design maximizes the interior volume, while minimizing the total building height. To further maximum the interior volume the roof structure is left exposed in the lobby and exhibit areas in lieu of a traditional ceiling system. Large glazed openings are provided throughout the public areas to take advantage of the views onto the wilderness park and a pair of large overhead glazed doors are provided to open the building onto the adjacent patio for large events.
Project Details
Project Size: 2,620 sq/ft
Number of Modules: 5
Payne Elementary School
Education
Inglewood, California
Payne Elementary School
Inglewood, California
Grossmont Cuyamaca College Classroom
Education
Grossmont, California
Grossmont Cuyamaca College Classroom
Grossmont, California
Grossmont Cuyamaca College Classroom
Grossmont, California
Project Details
Product Type: One-Story
Ocean View School District – Central Kitchen
Education
Huntington Beach, California
Ocean View School District – Central Kitchen
Huntington Beach, California
Ocean View School District – Central Kitchen
Huntington Beach, California
The Ocean View School District - Central Kitchen project consists of a permanent modular structure which houses the School District’s central production kitchen. The facility prepares and packages meals which are distributed and then severed at more than a dozen schools within the district. The building houses a lobby, office, restrooms, locker area, cooking line, produce preparation area, bakery, wash rooms, food storage room and support spaces. The building also serves and is directly connected to a panelized cold storage structure. The requirements required a custom designed modular solution which was capable of incorporating the unique structural, utility and spatial demands of a production kitchen facility. The roof structure utilized a project specific design which needed to be capable of supporting the roof top equipment and suspended exhaust hoods while also providing large pathways for the exhaust air, make-up air and conditioned air systems.
Project Details
Project Size: 4,800 sq/ft
Number of Modules: 10
Product Type: One-Story
Washington Prep School – Public Health Clinic
Commercial
Los Angeles, California
Washington Prep School – Public Health Clinic
Los Angeles, California
Department of Veterans Affairs – Outpatient Mental Health Facility
Commercial
Los Angeles, California
Department of Veterans Affairs – Outpatient Mental Health Facility
Los Angeles, California
Department of Veterans Affairs – Outpatient Mental Health Facility
Los Angeles, California
The Department of Veterans Affairs - Outpatient Mental Health Facility project consists of a two story structure which houses 30 exam rooms, 59 offices and consultation rooms, 2 break rooms, 6 waiting rooms, a large multi-purpose space and all necessary supporting spaces. The building’s exterior consists of two-tone stucco with bronze aluminum window and door systems to match the adjacent structures. The building interior utilizes various color and finish material schemes to develop clearly defined operational spaces and provide context to the occupants. The final building reflects the coordinated efforts of the design team and construction team to provide a client focused experience.
Project Details
Project Size: 25,520 sq/ft
Number of Modules: 31
Product Type: Two-Story
Kelseyville High School Classroom
Education
Kelseyville, California
Kelseyville High School Classroom
Kelseyville, California
Kelseyville High School Classroom
Kelseyville, California
Project Details
Product Type: One-Story
VIP Village MPR
Education
Imperial Beach, California
VIP Village MPR
Imperial Beach, California
VIP Village MPR
Imperial Beach, California
The multipurpose building houses a large multiuse assembly and lunch room, a kitchen, a staff lounge and restroom facilities. The building exteriors utilize a stucco finish system with a series of aluminum reveals and a flourish of colorful accents. Large overhangs with a standing seam roof system provide shade and weather protection at classroom entrances while the canopies provided at the multipurpose building creates visual interest while providing protection for the building entries. The classroom interiors feature vibrant accent colors and provide a comfortable learning environment.
Project Details
Product Type: Multi-Purpose Buildings
Aspire Antonio Maria Lugo Academy MPR
Education
Huntington Park, California
Aspire Antonio Maria Lugo Academy MPR
Huntington Park, California
Aspire Antonio Maria Lugo Academy MPR
Huntington Park, California
This building includes a multi-purpose room. The interior features abundant natural light in every educational space and 10’ high ceilings throughout. The finished building reflects the coordinated efforts of all team members to provide a design focused experience.
Project Details
Product Type: Multi-Purpose Buildings
KIPP: Academy of Opportunity MPR
Education
Los Angeles, California
KIPP: Academy of Opportunity MPR
Los Angeles, California
KIPP: Academy of Opportunity MPR
Los Angeles, California
This building includes a multipurpose space. The building exterior features plaster with a bright color palette and aluminum glazing systems. The finished building reflects the coordinated efforts of all team members to provide a design focused experience.
Project Details
Product Type: Multi-Purpose Buildings
Geyserville MPR
Education
Geyserville, California
Geyserville MPR
Geyserville, California
Crenshaw – US Housing LLC
Residential
Los Angeles, California
Crenshaw – US Housing LLC
Los Angeles, California
Crenshaw – US Housing LLC
Los Angeles, California
The Crenshaw project consists of a four-story structure which houses a multi-family apartment facility with 111 rental units. The project features 68 one-bedroom units, 53 studio units, rental office, community room, lobby, laundry room, trash rooms, utility rooms and roof top patio. All units are well appointed with a kitchen, living area and full bathroom. Ground floor units have private patios while the upper floors provide balconies at many units. The building exterior utilizes a multi-color stucco finish system with cement lap siding accents. A spacious roof top patio provides a gathering place for residents to mingle and relax.
Project Details
Project Size: 46,898 sq/ft
Number of Modules: 76
Alvarado – US Housing LLC
Residential
Los Angeles, California
Alvarado – US Housing LLC
Los Angeles, California
Alvarado – US Housing LLC
Los Angeles, California
The Alvarado project consists of a six-story structure which houses a multi-family apartment facility with 80 rental units. A five-story modular building sits above the site-built ground level podium. The project features 5 two-bedroom units, 33 one-bedroom units, 42 studio units, community room, laundry room, trash rooms, utility rooms and roof top patio. All units are well appointed with a kitchen, living area and full bathroom. Some units on level 2 have private patios while the upper floors provide balconies at many units. The building exterior utilizes a multi-color stucco finish system with cement lap siding accents. A spacious roof top patio provides a gathering place for residents to mingle and relax.
Project Details
Project Size: 38,155 sq/ft
Number of Modules: 76
Valencia Grove
Residential
Redlands, California
Valencia Grove
Redlands, California
Campo Elementary Head Start
Education
San Diego, California
Campo Elementary Head Start
San Diego, California
San Francisco Library
Commercial
San Francisco, California
San Francisco Library
San Francisco, California
University Park Elementary School
Education
Irvine, California
University Park Elementary School
Irvine, California
University Park Elementary School
Irvine, California
The University Park Elementary School project consists of a single-story STEAM classroom building. The building contains 8 instructional classrooms, a flexible learning and collaboration central core area, restrooms, and support spaces. The building exterior features a stucco exterior finish with overhangs on all sides of the building. Parapets are provided to screen the roof top mechanical equipment. Alcoves were created at each exterior door to facilitate safe and efficient egress around the building. All instructional spaces feature vinyl plank flooring and upgraded wall coverings. All classrooms have direct access to the central core which is used for small group learning and collaboration.
Project Details
Project Size: 9,516 sq/ft
Number of Modules: 24
Product Type: One-Story
Soledad Women’s Health Center
Commercial
Soledad, California
Soledad Women’s Health Center
Soledad, California
Soledad Women’s Health Center
Soledad, California
The Soledad Women's Health Center project consists of a single story building which contains a lobby, 2 community classrooms, a private office, 5 medical provider workstations, 7 exam rooms, a break room, restrooms and various support spaces. The building exterior utilizes stucco finish system with a color scheme to match existing adjacent building on the medical campus. The building design utilizes modules of various lengths and alignments to create visual interest at the public entrance. The building interior utilizes various color and finish material schemes to develop clearly defined operational spaces and provide a comfortable and healthy environment for the occupants.
Project Details
Project Size: 3,600 sq/ft
Number of Modules: 8
Sacramento County Waste Water Treatment Plant
Commercial
Sacramento, California
Sacramento County Waste Water Treatment Plant
Sacramento, California
Sacramento County Waste Water Treatment Plant
Sacramento, California
The Sacramento County Waste Water Treatment Plant project consists of two structures which are connected by a covered walkway. The primary structure houses 25 private offices, 2 open office areas, 8 conference rooms, lobby, break room, archive/storage spaces and restroom facilities. The secondary structure houses additional open office space. The electrical distribution was designed to minimize interconnection between modules. The mechanical distribution systems were design to meet the zoning requirements necessary for the occupants while limiting the horizontal connections necessary in the field. Specialized floor frame elements were used in locations where recessed flooring was required. The buildings’ exterior is covered with a smooth fiber cement panel which utilizes a series of reveals, joints and trims to provide a contemporary appearance.
Project Details
Project Size: 20,880 sq/ft
Number of Modules: 29
Gilroy USD – Glen View ES
Education
Gilroy, California
Gilroy USD – Glen View ES
Gilroy, California
Gilroy USD – Glen View ES
Gilroy, California
The Glen View Elementary School project consists of 3 separate buildings which house 7 classrooms, student and staff restrooms, and 3,200 GSF of administrative space. The building’s exterior consists of stucco with tile accents and aluminum window and door systems. The exterior walls were built in multiple planes and heights to allow for the use of clerestory windows which are combined with shade devices and accents to create a striking architectural impression while being well integrated into the architectural character of the existing site. The final building reflects the coordinated efforts of the client, design team and construction team and presents a design focused experience.
Project Details
Project Size: 12,128 sq/ft
Number of Modules: 35
Product Type: One-Story
Metrolink – Riverside Operations Control Center
Commercial
Riverside, California
Metrolink – Riverside Operations Control Center
Riverside, California
Metrolink – Riverside Operations Control Center
Riverside, California
The Riverside Metrolink project consists of a single structure which houses a railroad operations control facility and the related functional spaces. The building contains 4 private offices, open office areas, conference room, lobby, kitchenette, data center and restroom facilities. The buildings’ exterior is covered with a mixture of plaster, brick veneer and metal siding which combine to provide a unique architectural presence. The building interior features abundant natural light in the work spaces and 9’ high ceilings throughout.
Project Details
Project Size: 3,168 sq/ft
Number of Modules: 8
Burbank USD – Monterey Continuation High School
Education
Burbank, California
Burbank USD – Monterey Continuation High School
Burbank, California
Burbank USD – Monterey Continuation High School
Burbank, California
The Monterey Continuation High School houses 3 classrooms, 7 private counseling/staff offices, a group room, a staff workroom and full restroom facilities. The project exterior consists of 2-tone stucco with overhangs providing shelter at the exterior walkways. The interior spaces all feature abundant natural daylight from view windows and/or tubular skylights. The roof top mechanical equipment is fully concealed by decorative metal screening. Providing a high performance learning environment and achieving a LEED Silver rating was a fundamental goal for the project, to that end Silver Creek developed a number of high performance and cost-effective strategies. A single ply “cool roof” was combined with increased thermal insulation throughout the building to provide a highly efficient building envelope. Thermally broken aluminum windows with high performance glazing were provided in almost every regularly occupied space to provide natural daylighting and exterior views.
Project Details
Project Size: 5,280 sq/ft
Product Type: One-Story
Corcoran Police Station
Commercial
Corcoran, California
Corcoran Police Station
Corcoran, California
Corcoran Police Station
Corcoran, California
The Corcoran Police Department building contains a lobby, community meeting space, private offices, locker rooms, armory, holding cells, a sally port, evidence storage room and various support spaces. The building exterior utilizes brick veneer with plaster accents to provide a dignified appearance. The building design utilizes modules of various lengths and alignments to create visual interest at the public entrance. The building interiors utilize materials selections that consider the durability and function required for a law enforcement facility while also providing a comfortable working environment.
Project Details
Project Size: 11,472 sq/ft
Number of Modules: 23
Antelope Valley Solar Ranch One
Commercial
Antelope Valley, California
Antelope Valley Solar Ranch One
Antelope Valley, California
Antelope Valley Solar Ranch One
Antelope Valley, California
Antelope Valley Solar Ranch One is one of the largest solar photovoltaic projects in the world, with approximately 3.8 million solar panels. This single-story structure houses 6 private offices, a conference room, a lobby, a lounge, a control station, a warehouse and restrooms. The building exterior is a mixture of corrugated metal siding and stucco which uses a color palette designed to blend in with the surrounding landscape. The building interior utilizes a 2-tone paint scheme with unique flooring patterns. A mixture of traditional raised floor modules were joined with slab-on grade modules to develop an inventive modular building concept. This concept combined with thoughtful finish selection allowed Silver Creek to a deliver a truly striking project.
Project Details
Project Size: 4,057 sq/ft
Pacific Drive Elementary School
Education
Fullerton, California
Pacific Drive Elementary School
Fullerton, California
Pacific Drive Elementary School
Fullerton, California
To meet the needs of the growing student population the Pacific Drive Elementary School needed a fast and cost effective solution to provide additional restroom facilities. This new modular restroom facility includes three gender neutral single occupant restrooms. One of restrooms has been designed to accommodate a changing facility for special needs students. The building exterior utilizes fiber cement wall panels to provide a durable finish system. A large overhang with a standing seam roof system provides shade and weather protection at the restroom entrances. Durable and easily cleanable finishes were used throughout to minimize maintenance concerns.
Project Details
Project Size: 255 sq/ft
Number of Modules: 1
Product Type: One-Story, Restrooms, Relocatable Classrooms
Inglewood USD Restroom
Education
Inglewood, California
Inglewood USD Restroom
Inglewood, California
Orange USD Restroom
Education
Orange, California
Orange USD Restroom
Orange, California
Thermolito USD
Education
Thermolito, California
Thermolito USD
Thermolito, California
SoCal Restroom Exterior
Education
Imperial Beach, California
SoCal Restroom Exterior
Imperial Beach, California
Silver Creek Relocatable Classrooms
Education
California
Silver Creek Relocatable Classrooms
California
Silver Creek Relocatable Classrooms
California
For decades relocatable classrooms buildings have been utilized to create high-quality learning environments while providing tremendous budget and schedule advantages when compared to other solutions. At Silver Creek we have played a significant role in the relocatable classroom market with a project portfolio that includes the design and construction of more than 1,000 relocatable classroom buildings. Whether it’s a district looking to expand their campus, provide temporary classrooms during a modernization project, or a dealer looking to grow their lease fleet, Silver Creek’s capacity, experience and DSA approved PC’s offer options for every schedule and budget. With several DSA pre-approved designs allowing for varying widths, lengths, heights and finishes we are sure to have an option to meet your project requirements.
Project Details
Product Type: Relocatable Classrooms